PVC (Rigid) Riser Instructions
For 1.25"-2" Well Developers, use .50" Schedule 40 Riser Pipe
1. Attach the riser by using either tightening the small setscrew on top of the Well Developer or using the Flush Thread Adapter to provide a more secure seal.
2. Lower the Well Developer into the well, adding PVC lengths as needed, holding each link at the top with vice grips.
3. Once the Well Developer is at the bottom of the well, add the Upper Ball Valve Assembly with 5 feet of 1/2-inch ID clear vinyl tubing. (See Upper Valve Assembly photo.)
4. Insert the tubing end into a 5-gallon bucket. If possible, clamp the tubing onto the bucket or drill a 5/8-inch hole into the bucket near the top and insert the tubing through the hole to prevent the tubing from falling out.
|